Customer Case Study:

Resilience Project

Fast Facts

  • Location

    42 sites throughout Victoria
  • Date of completion

    December 2018
  • Project Type

    Co - generation upgrade project
  • Scope

    Embedded generator upgrade to allow synchronising with the grid

Scope of works

Design, supply,install and commission of embedded generators (diesel) to support and strengthen the electrical connection arrangements across 42 Telstra exchange sites across Victoria.

This reconfiguration of electrical connection will allow Telstra to export electricity to the grid at peak demand periods.

Key Results

  • First embedded generator to export back to the grid in Australia for Telstra (Kew Site)
  • Fast tracked DNSP negotiations to ensure practical completion on time
  • Complex embedded metering system creating revenue source for Telstra