Telstra Resilience Project

icon

Fast Facts

First embedded generator to export back to the grid in Australia for Telstra (Kew Site)
Fast tracked DNSP negotiations to ensure practical completion on time
Complex embedded metering system creating revenue source for Telstra

Scope of Work

Design, supply, install and commission of embedded generators to support and strengthen the electrical connection arrangements across 42 Telstra exchange sites across Victoria. This reconfiguration of electrical connections will allow Telstra to export electricity to the grid at peak demand periods.