Melbourne Water
Construction of two major ground mount solar farms at Melbourne Water’s Eastern Treatment Plant in Bangholme and Winneke Water Treatment Plant in Christmas Hills, Victoria.
Key outcomes
- Contributing to Melbourne Water’s commitment to reducing net carbon emissions to 50% of baseline levels and creating a pathway to net zero by 2030.
- Constructed the Winneke solar farm across sloping terrain with minimal soil disturbance, protecting water quality in the nearby Sugarloaf Reservoir.
- Delivered DC electrical and mechanical installation using NG/E’s internal construction team.