nge-dev
Categories
- Battery Energy Storage Case Studies
- Carpark Solar
- EV Charging Case Studies
- Solar Case Studies
- Uncategorised
-
Mandalay Mines
Scope of works Supply, install and commission major electrical infrastructure to manage a site load of greater than 3MW including integration complete with load shedding with 3 diesel generators.
View case study -
ISPT – Rooftop Solar Project
Scope of works Design and construction of a 3MW solar PV system, upgrade of electrical mains and metering and integration with on site SCADA.
View case study -
NBN LED Upgrade
Scope of Work Upgrade of approximately 500 light fittings across two NBN warehouses in Port Melbourne and Nunawading. In order to reduce energy costs and improve its carbon footprint, NBN engaged Next Generation Electrical (NG/E) to design, supply, install and commission the LED project across both sites
View case study -
Melbourne Markets LED Upgrade
Scope of Work Upgrade of 3,350 light fittings at Melbourne Market Authority in Epping from traditional lighting to LED. MMA is 60-hectare purpose built facility. In order to reduce energy costs and improve its carbon footprint, MMA engaged Next Generation Electrical to design, supply, install and commission the LED project.
View case study -
Telstra Resilience Project
Scope of Work Design, supply, install and commission of embedded generators to support and strengthen the electrical connection arrangements across 42 Telstra exchange sites across Victoria. This reconfiguration of electrical connections will allow Telstra to export electricity to the grid at peak demand periods.
View case study -
Utilicor Power Factor Correction Project
Scope of Work Installation, commissioning and testing of 21 power factor correction units across 18farming sites in Murray Valley region.
View case study -
Melbourne Airport Offgrid Solution
Scope of Work Design, fabrication, supply, installation, testing, & commissioning of a 99kW microgrid, including a containerised battery storage system and generator. This innovative solution allowed our client to avoid hefty network augmentation costs while creating ongoing energy efficiencies.
View case study -
EnelX Riverland Project
Scope of Work Design and construction of 8MW of battery storage across 5 sites in the Riverland Region on behalf of Central Irrigation Trust (CIT).
View case study -
LaTrobe University
Scope of Work La Trobe University’s Net Zero program will see the university lead the way to become carbon neutral by 2029. As a strategic partner, NG/E installed both rooftop and car park solar systems at the Bendigo and Wodonga Campuses.
View case study -
Vicinity Centres
Scope of Work Design and construction of a 28MW solar PV system, upgrade of electrical mains and metering and integration with on site SCADA.
View case study