Scope of works

Network studies, design and installation of 2 x 1.3 MVA / 2.5 MWh Tesla Megapacks and the associated electrical infrastructure required for successful connection to the grid. The BESS solution will be utilised in the EvoEnergy electricity grid for load management and FCAS services.

Results

  • ACT's largest privately owned grid connected battery energy storage system.
  • Software Integration including SCADA overview control screen, dashboards, reports, alarms and financial estimation.
  • The HV and LV relays on either side of the transformers are set to protect the transformer and downstream network from three phase and single line faults.

Fast Facts

  • Battery Storage 2 x 1,331 kVA / 2,529 kWh
    (total 2,662 kVA / 5,058 kWh)
    Tesla Megapack (Lithium-Ion)
  • Grid Connection 11kV feeder with Evo Energy via 2 x 2MVA step up transformers and three-way switching station
  • SCADA and metering Schneider Electric StruxureWare Power SCADA Operation PMCS
    System solution
  • Protection Primary protection is Schneider Electric Sepam S40 series and ComAP Intelipro relays while the SEL 751 relays acts as a backup